Siding completed

The previous post had shown the progress of the siding on the south and East side. This latest post shows what a difference complete siding and can make! The envelope of the home has been transformed.

DSC_1131

Ed rocks

it looks much larger than it really is

it looks much larger than it really is

DSC_1092

Oh those eaves!

DSC_1136

Josh going to town on the recessed cans.

DSC_1088

view from the host home back door

DSC_1089

temporary front door

DSC_1093

fireplace and recessed cans are IN!

DSC_1096

Electrical details.

DSC_1102

the North side of the ADU and tiny ‘doghouse bump out’ for the fireplace

DSC_1106

River daydreaming.

DSC_1112

view as you approach the ADU from the front path.

DSC_1114

Look at those repeated angles. That is sexy.

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s